How fast can a modular vehicle bridge be installed on site?
Modular vehicle bridges: built faster, with less disruption
Struktis delivers modular vehicle bridges that shift most work off-site—cutting on-site time, plant hours and closures. Pre-engineered spans and components are manufactured in controlled conditions, then installed quickly to keep traffic, farm operations and haul routes moving. This approach reduces weather risk, improves safety and minimises environmental disturbance in waterways and soft-ground sites.
Ideal for farm crossings, forestry haul roads and local council detours
Off-site manufacture, rapid craned installation
Staged works and temporary bypass options to maintain access
What load ratings and materials do you offer for vehicle bridges?
Design, materials & load rating options
We engineer vehicle bridges to Australian conditions and heavy-vehicle demands, with configurations to match your site and program.
- Superstructures: steel girders with composite or precast decks; full-precast options; engineered timber for low-volume rural roads
- Widths & geometry: single-lane or two-lane, skewed spans, curved approaches, barrier integration
- Deck & barriers: anti-skid surfacing, services conduits, compliant bridge barriers and handrails
- Compliance: designed to the AS 5100 Bridge Design series and relevant heavy-vehicle load models; assessment/strengthening options for existing crossings.


Can you replace an existing crossing with minimal downtime?
Replacements & upgrades with minimal downtime
Need to replace a failing culvert or narrow crossing? Our modular method makes vehicle bridge replacements fast and predictable. We can reuse suitable abutments, deliver pre-measured spans for a tight fit, and schedule overnight or weekend installs to minimise closures. Where required, we establish temporary bypass access and apply erosion/sediment controls to protect waterways—so your community or operations stay connected while the upgrade happens.
Footings and foundations
The footings and foundations of bridges are arguably the most important elements. Struktis has extensive experience conducting geotechnical soil tests and working with a range of soil conditions, water levels and flooding, seismic activity, and other environmental factors. Every project presents new challenges, and we’ve created new solutions specific to each project.
1. Geotechnical soil testing
Geotechnical soil testing is the first step in our bridge construction process. Here, we assess soil properties to inform our foundation design. With thorough soil testing, we ensure the structural integrity and stability of our bridges.
2. Geotechnical results assessments
The results from our geotechnical tests play a pivotal role in the design of our bridges, providing crucial insights into soil conditions and properties. By analysing these results, we tailor our bridge designs to ensure optimal stability, durability, and safety.
3. Design and engineering site assessments
Our site assessments allow us to gather essential data on terrain, environmental conditions, and structural factors. Through thorough analysis of these assessments, we develop customised bridge designs that prioritise functionality and safety.
4. A dedicated team of expert site installers
Our team of experts has extensive experience in every aspect of the bridge construction process, from foundation work to final installation. Our expertise ensures we execute our bridges with structural soundness, precision, and efficiency.
Request a detailed estimate
Please provide details including location, intended use and whether this is a new bridge, boardwalk, lookout or replacement. Location photos are highly recommended.